LETI Embodied Carbon overlay
The LETI Embodied Carbon Primer; Supplementary guidance to the Climate Emergency Design Guide is represents LETI’sunderstanding of how designers need to be designing to meet the climate change targets in 2020. It is intended the primer will evolve over time, reflecting changes in carbon budgets, technologies and the capability of industry.
It outlines in detail the magnitude and challenges and the approach taken by LETI to establish guidance. It also summarises the actions to be taken at each RIBA design stage as well as the requirements of four key UK building archetypes in relation to embodied carbon reductions.
For further information and to download the LETI Embodied Carbon Primer Overlay to the RIBA plan of work visit here.
[edit] Related articles on Designing Buildings
- BIM outline plan of work.
- Comparison of BIM work stages.
- Comparison of work stages.
- Digital plan of work.
- Designing Buildings Wiki project plans.
- Governance for Railway Investment Projects (GRIP).
- OGC gateway review.
- Plan of work
- Project lifecycle for major road projects.
- RIBA Plan of Work for Fire Safety.
- RIBA plan of work v project plans v OGC gateways.
- RIBA.
- RIBA plan of work.
- The construction playbook.
Featured articles and news
Top 50 firms awarded 52bn of projects in the last year
New engineering data shows.
Enhancing construction site reporting efficiency
Through digitisation and the digital revolution.
Noise in the built environment
BSRIA guide TG 20/2021.
17,000 people suffer conditions as a result of exposure to excessive noise at work.
Turning down the noise: Auditory health
A pervasive risk with far-reaching consequences.
UK Construction Week, London is here !
Debuting major international pavilions and much more.
Getting the most out of heat pumps and heating
How heat pumps work and how they work best.
Plumbing and heating for successful retrofit and renovation
Low temperature underfloor systems and heat pumps.
Cost-of-living crisis and home improvement plans
Starting on the right footing and top tips for projects.
Delays on construction projects
Types, mitigation and the acceleration of works.
From Chaucer to Fawlty Towers.
Electrotechnical excellence, now open for entries.
Net zero electricity grids BSRIA guide NZG 5/2024
Outlining the changes needed to transition to net zero.
CIOB Global Student Challenge 2024
Universitas Indonesia wins for second year running.
ECA 2024 Apprentice of the Year Award
Entries open for submission until May 31.